Electricity Regulation Act, 2006 (Act No. 4 of 2006)RegulationsElectricity Regulations for Compulsory Norms and Standards for Reticulation Services1. Definitions |
In these Regulations, any word or expression to which a meaning has been assigned in the Act, shall have the meaning so assigned and, unless the context otherwise indicates—
"building"
includes any other structure, whether of a temporary or permanent nature and irrespective of the materials used in the erection thereof, erected for or in connection with—
(a) | the accommodation or convenience of human beings or animals; |
(b) | the manufacture, processing, storage, display or sale of any goods; |
(c) | the rendering of any service; |
(d) | the destruction or treatment of refuse or waste materials; or |
(e) | the cultivation or growth of any plant or crop. |
"time of use"
means measurement of energy consumption on a time interval basis,
"integrated power system"
means the interconnected network of electricity lines and equipment that connect the transmission, distribution and reticulation systems in South Africa;
"the Act"
means the Electricity Regulation Act, 2006 (Act No. 4 of 2006),
"smart system"
means an electricity system that allows for—
(a) | measurement of energy consumed on a time interval basis, |
(b) | two-way communication between the customer/end-user and the licensee, |
(c) | storage of time interval data and transfer it remotely to the licensee, and |
(d) | remote load management. |
[Definition substituted by Notice No. 1190 of 2008]
"system operator"
means a licensed entity responsible for directing the operation and the reliability of the integrated power system