Acts Online
GT Shield

Labour Relations Act, 1995 (Act No. 66 of 1995)

Notices

Bargaining Council for the Metal and Engineering Industries

Extension of the Consolidated Main Collective Agreement to Non-parties (for the period 1 July 2021 to 30 June 2024)

Part 2

4. Technical Schedules

Division E/2

Wage Rates Applicable to Operations Scheduled in Division E/2 are Prescribed in Clause 3(a) of Part II of this agreement

Section (a): Manufacturing Section

 

RATE AA

1. Final testing.

 

RATE B

1. Supervisory work, including batch checking and/or grading.

 

RATE D

1. Repetition adjusting of cores and/or components and/or mechanically operated assemblies to pre-set limits by electrical measurements, including replacement of defective mechanically adjustable components identified by the test process.

 

RATE DD

1. Repetitive batch mechanical and/or electrical checking and/or adjusting of equipment and/or sub-units and/or components by comparison of fixed standards with predetermined limits by means of comparators and/or deviation meters and/or special purpose test gear, including replacement of defective components identified by the testing process, under supervision of a Rate AA employee.

 

RATE DDD

1. Wiring and/or assembling of alarm units and/or devices to instructions and/or running out lists and/or planning cards and/or pictorial sketches and/or samples and/or audio aids and/or photographs.

 

RATE F

1. Application of infra-red filter lacquer.
2. Laying and binding of cable forms from prepared running out lists on pre-prepared cable form boards.

 

RATE G

1. Affixing dust proof seals.
2. Application of anti-corrosive and/or protective coatings.
3. Assembling of pre-manufactured components from stock requiring no fitting or adjusting, but including deburring.
4. Dressing and deburring by hand and/or by grinding and/or by portable power tools.
5. Making of terminal boards by hand operated punch.
6. Manual and/or treadle pressing and/or notching and/or punching where the work is operated upon with dies and/or stops (excluding setting of dies).
7. Repetition cold bending and/or forming to jigs and/or length gauges and/or stops.
8. Repetition cutting to stops and/or templets and/or jigs and/or length gauges and/or fixtures and/or marks (excluding setting up).
9. Repetition drilling to fixtures and/or jigs and/or stops and/or templets.